Development Plan of Darkhovain Oilfield
Objectives
Phase1
- Production of 50 thousand barrels a day of oil
- Injection of 70 million cubic feet a day of gas
Phase2
- Production rise by 160 thousand barrels a day of oil
- Gas injection capacity rise by 280 million cubic feet a day
Phase3
- Forecasting 80thousand barrels a day of oil production from Fahlian, Illam and Sarvak layers
Location
The field is located 30km north of khoramshahr and 100km southwest of Ahvaz city, along khoramshahr-Ahvaz Road.
Major Contractors
Phase1, 2: ENI Iran/NICO
Phase3: negotiation with buy-back contractors is under way
Executive Activities
- Drilling of 3 delineation wells, 5 production wells and 1 gas injection well, and construction of a production unit with nominal capacity of 55 thousand barrels a day of oil along with all transmission pipelines and wellhead installations at first phase of the project
- Drilling of 15 production wells, 3 gas injection wells and 1 disposal well, and construction of a production unit with nominal capacity of 165 thousand barrels per day of oil together with all flow pipelines and wellhead installations at second phase of the project
- Implementation of feasibility study of phase3 by ENI company
- Defining delineation stage of the project as well as preparing required document by using internal sources
- Opting buy-back contractors to develop phase 3 of Darkhovain field
Key Schedule
- Confirmation date of contract : June 30, 2001
- Production of 50 thousand barrels a day of oil: August 2004
- Oil Production rise by 160 thousand barrels a day: September 2010
- Gas injection capacity rise by 280 million cubic feet a day: November 2010