Plans and Projects
27 سپتامبر 2011
Objectives
- Crude oil production ceiling enhancement
- Processing and transmission capacity rise from 65000 barrels a day of crude oil to 100 thousand barrels
- Exploring the feasibility of boosting daily production ...
27 سپتامبر 2011
Objectives
- Achieving advanced technology and localizing it.
The plan is carried out at kuh-mond, Zagheh and Ferdousi Oilfields.
Executive Activities Implemented at Kuh-mond heavy Oilfield
- Applying 3D seismic operations as well as ...
27 سپتامبر 2011
Objectives
- Prevention of combusting some 241million cubic feet/d of sour gas associated with Bangestan layer oil of Ahvaz, Aab Teimour, Mansouri, Copal and Maroun reservoirs
- Crude oil production rise by ...
27 سپتامبر 2011
Objectives
- Drilling of new injection and production wells to boost reservoir oil recovery capacity from 1.5 billion barrels to 2.5 billion
Once the project is implemented, average crude oil production capacity ...
27 سپتامبر 2011
Employer:
Petroleum Engineering and Development Company
Objectives
- Daily production rise by 25 thousand barrels of oil together with the current output
- Feasibility of producing oil from Masjid Suleiman oilfield with over ...
27 سپتامبر 2011
Objectives
- Identification as well as description of the field
- Reservoir study and provision of master development plan for the field using data obtained by 3D seismic studies
- Drilling of two ...
27 سپتامبر 2011
Objectives
(It is considered for two fields)
- Azar field: daily production of 65 thousand barrels of oil in two phases
- Changuleh field: reservoir description as well as early production of 10 ...