Development Plan of Mansouri Oilfield

27 سپتامبر 2011

Objectives -        Crude oil production ceiling enhancement -        Processing and transmission capacity rise from 65000 barrels a day of crude oil to 100 thousand barrels -        Exploring the feasibility of boosting daily production ...

naft_sangin_top

Development Plan of heavy and extremely heavy oilfields

27 سپتامبر 2011

Objectives -        Achieving advanced technology and localizing it. The plan is carried out at kuh-mond, Zagheh and Ferdousi Oilfields.   Executive Activities Implemented at Kuh-mond heavy Oilfield -        Applying 3D seismic operations as well as ...

amak_top

Associated Gas Gathering Plan (AMAK)

27 سپتامبر 2011

Objectives -        Prevention of combusting some 241million cubic feet/d of sour gas associated with Bangestan layer oil of Ahvaz, Aab Teimour, Mansouri, Copal and Maroun reservoirs -        Crude oil production rise by ...

dorood_top

Development Plan of Dorud Oilfields

27 سپتامبر 2011

Objectives -        Drilling of new injection and production wells to boost reservoir oil recovery capacity from 1.5 billion barrels to 2.5 billion Once the project is implemented, average crude oil production capacity ...

masqu_soleyman_top

Development Plan of Masjid Suleiman Oilfields

27 سپتامبر 2011

Employer: Petroleum Engineering and Development Company Objectives -        Daily production rise by 25 thousand barrels of oil together with the current output -        Feasibility of producing oil from Masjid Suleiman oilfield with over ...

bande_karkhe_top

Development Plan of Band-e- Karkheh Field

27 سپتامبر 2011

Objectives -        Identification as well as description of the field -         Reservoir study and provision of master development plan for the field using data obtained by 3D seismic studies -         Drilling of two ...

azar_changole_top

Development Plan of Anaran Block Field (Changuleh and Azar Oilfields)

27 سپتامبر 2011

Objectives (It is considered for two fields) -        Azar field: daily production of 65 thousand barrels of oil in two phases -        Changuleh field: reservoir description as well as early production of 10 ...



Links

Major Objectives:

- Overseeing the implementation of all engineering and development plans in the framework of design, engineering, construction as well as implementation of activities executed at onshore and offshore oil and gas sector within NIOC.
- Managing human resource to provide expert staff from inside the oil industry and to recruit and train young and well-educated personnel.